Have you been waiting long?

We certainly have. Our oldest invoice from the architect is dated January 26, 2011. That’s a long time ago, and we still haven’t started anything. Mostly what we’ve done is some planning, and lots and lots of waiting. And some packing:

That last shot is of our (unpacked) kitchen, which will get the most dramatic make-over.

We received two contractor bids, and went into a severe state of sticker-shock. One was 100% over what we hoped to spend, the other only 60% over! So we’re meeting with the low bidder, hoping to come up with enough of the right cuts to make this reno affordable, but still worthwhile. For sure we’re cutting out the enclosed front porch (not everyone in the family was onside with that anyway). We’ll also do little or nothing with the upstairs bathroom, apart from a new toilet and a fresh coat of paint. Some further cuts in the basement? We’ll see. What I really don’t want to compromise on is the main floor (and Maria’s promised boxed out window). Although we don’t plan on selling before we die, I want us to enjoy high-quality finishes that will last, and add to the resale value eventually.

Of course, we still have to wait for the building permits.

Advertisements

About metermaid50

Vocation: teaching Job: ESL instructor in a private language school Family: one husband and two teenage daughters Pets: two cats, Kisa and Boo Passions: knitting, reading (mostly genre books), movies
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s