A slow week

Not much doing this week, although I do have pictures. Mostly we’ve been waiting to hear from the millwork guy who’s making our kitchen. He was struggling with how to deal with this big honking duct sticking out from the wall, between the kitchen and the sunroom that doesn’t show up on any of the architectural drawings of the kitchen (what were we paying for?).

 

 

 

 

 

 

 

 

 

 

 

 

After waiting a week, we’ve been told we can turn the duct so it lies flush against the wall, returning the kitchen plans back to their original layout. Things will start moving with the kitchen, which then means the electrical and plumbing can get started.

Speaking of plumbing, the basement is also in a holding pattern as this:

 

 

 

 

 

now looks like this:

 

 

 

 

 

 

 

 

 

 

 

 

The clay drainage pipe to the sewer system is being replaced. They have dug up the basement (I can’t do laundry, since there’s a pile of dirt in front of the washer and dryer), and then delivered a backhoe to our front yard. And that is all that’s been done. So we keep waiting.

 

Advertisements

About metermaid50

Vocation: teaching Job: ESL instructor in a private language school Family: one husband and two teenage daughters Pets: two cats, Kisa and Boo Passions: knitting, reading (mostly genre books), movies
This entry was posted in Uncategorized and tagged . Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s